Drivers to pay Tacoma Narrows Bridge tolls longer than expected to cover construction costs

The bridge is expected to be paid off by 2033.

TACOMA, Wash. — A pandemic and a fire almost proved too much for Gig Harbor Strength and Fitness, but the gym managed to survive.

“We had to rebuild literally from the ashes, so to speak,” says the gym’s owner, Coach Dimitri Mlknyk. “And we’re still here.”

But that recovery wasn’t easy, especially with a toll booth right outside.

→ Continue reading at King 5

Similar Articles

Advertisment

Most Popular